Modi File Research, records, achievements and public life Tuesday, October 27, 2026

Man of Determined Intentions

Narendra Modi, his political journey, governance record, and India transformation story.

Infrastructure & Mega Projects

What was the situation of roads in India before 2014, and how has it changed from 2014 until today?

What was the situation of roads in India before 2014, and how has it changed from 2014 until today?

Before 2014 — The Struggling Era

India’s road infrastructure before 2014 was severely underdeveloped and underfunded:

  • In 2013–14, India’s National Highway network measured just 91,287 km, and the pace of highway construction averaged only 11.6 km per day, a figure that appeared modest against the demands of a 1.4-billion-person democracy with vast geographic diversity.
  • Roads were plagued by poor quality, lack of maintenance, missing connectivity in rural and remote areas, and extremely slow project execution.
  • Budget allocation was low, land acquisition was a nightmare, and bureaucratic delays stalled most major projects.
  • Rural India was largely disconnected, villages lacked all-weather road access, hampering education, healthcare, and economic activity.

After 2014 — The Transformation

National Highways — Massive Expansion:

  • The NH network expanded by 60% from 91,287 km in 2014 to 1,46,145 km by 2023. The length of 4-laned NH increased 2.5 times, from 18,387 km to 46,179 km.
  • High-speed corridor length expanded from just 93 km in 2014 to 2,474 km today, with 3,600 km of high-speed corridors built in the last five years alone.

Speed of Construction — Record Breaking:

  • The highway construction pace rose dramatically to 34 km/day in 2025, up from 11.6 km/day in 2014.
  • The average annual highway construction during 2014–2024 increased by about 130% compared to the previous decade (2004–2014).

Budget — Unprecedented Investment:

  • There has been a 6.4 times increase in the Centre’s investment in road infrastructure between 2013–14 and 2024–25, and the road transport and highway budget shot up by 570% from 2014 to 2023–24.

Rural Roads — PMGSY:

  • An impressive 3.74 lakh km of rural roads were constructed since 2014 under the Pradhan Mantri Gram Sadak Yojana (PMGSY), connecting previously isolated villages.

Key Flagship Projects:

  • Bharatmala Pariyojana, one of India’s largest road development initiatives, has resulted in 17,411 km of roads being constructed and 26,425 km awarded, boosting the length of high-speed corridors 12-fold.
  • The Ganga Expressway — 594 km connecting Meerut to Prayagraj  was inaugurated in April 2026, reducing travel time and boosting logistics across Uttar Pradesh.

Global Recognition:

  • India climbed from Rank 54 in 2014 to Rank 38 in 2023 on the World Bank’s Logistics Performance Index.

In summary, pre-2014 India had slow, underfunded, and poorly connected roads. Post-2014 has seen a near-revolution — faster construction, larger networks, better quality, rural connectivity, and expressways that are genuinely world-class.

Read this next: What was the job and employment situation in India before 2014, and how has it changed after 2014 until today?